Instructions For Installing A Walk In Cooler Freezer

Qandeel Nazir
3 min readAug 5, 2021

Installing a walk-in cooler is one tricky job. There are proper technicians who have expertise in installing a commercial walk-in cooler. DIY is out of the question when it comes to a commercial walk-in cooler because it is one massive piece of equipment that is loaded with highly engineered components and you as a layman would destroy the components. This job requires a properly trained technician. So make sure you have fixed your appointment with a commercial walk-in cooler installation expert.

Inspect your commercial walk-in cooler just when it delivers — While unboxing the panels of a walk-in cooler, make sure that each panel has been delivered to you safely and nothing is damaged. If you find anything damaged and non-relative to your particular walk-in cooler just dial the claim number provided by the services. Usually, shipping is one safe way of sending machinery to far destinations but sometimes equipment gets a bit damaged during travel. So, you must inspect all the panels and components of your commercial walk-in cooler.

Check all panels and handle them — Before shipment, the panels go through quality check control individually so that you won’t have to go through the trouble of returning one. Anyways, once you unbox the material put the panels on a steady surface to avoid dents and damages. Use sufficient manpower for handling and dropping purposes.

Prepare your site for installation — Make sure that the place you have chosen for installation purposes is okay and doesn’t have any moisture on it. Mark the crucial points with some chalk or marker for good measurement.

Take measures for floor panels — Once the installation site is cleared now you need to mark down the lines for floor panels. The lines will help you with the exact installation.

Measures for floorless installation — Marking is also necessary for wall purposes however if the surface is dry that is more preferable for a floorless walk-in cooler. Make sure that you place the panels on the exact lining that you draw.

Wall assembly for installation — Follow the draw lines and select a rear corner panel, place it even with the outside of the base, and partially lock it into position. Select a wall panel on either side of the corner, firmly lock these panels to the corner. Once the structure is stabled on exact marks then it’s time to completely lock the panels so it may not loosen up with time.

Measures for indoor installation — For a ceiling over 16 ft. long, a suspended support system will be supplied.

Supports should be installed as per the engineering drawing supplied by the factory.

Measures for outdoor installation — Make sure the material of your walk-in cooler is highly reliable if that’s for outdoor purposes. A rainproof cap is recommended for safety purposes. The outdoor rainproof membrane is a 40-mill polyester fabric.

Rain roof installation instructions — Make sure that the material quality can withstand the heavy rainfall, however, we don’t recommend an outdoor walk-in cooler if you are in a tropical rainy area. Place vinyl roofing material, with flaps underneath, on top of walk-in across narrow end. Allow 6″ of vinyl to lap over each of the three sides. Carefully unroll vinyl material until vinyl flap falls into position.

--

--

Qandeel Nazir

The future is uncertain, but that can be a good thing. — Jennifer Niven